You don't have javascript enabled. Good luck with that.
Pencarian
Petugas UPS Badan Air Bersihkan Lingkungan Pasca Banjir di RW 03 Pegangsaan Dua

Cakung Lama River Cleared from Waste

Personnel from the Waste Management Unit (UPS) under the Jakarta Environmental Agency's Water Agency clean up waste in the Cakung Lama River, precisely on the border of Pegangsaan Dua and Sukapura urban villages.

15 personnel were deployed to clean up waste

Cilincing Sub-district's Water Agency UPS Coordinator, Munawir said post-flood waste handling was focused on river flows that crossed RW 03, Pegangsaan Dua Urban Village and RW 10, Sukapura Urban Village.

"15 personnel were deployed to clean up waste, especially waste that get stuck under bridges," he expressed, Friday (3/1).

Cakung Lama River Dredging Work Has Touched 80 Percent

They managed to collect 12 cubic meters of waste and was then transported by a tripper truck.

"Most waste collected are wood, plastic, leftover food, and drink packaging to used clothes," he explained.

According to him, the waste handling was done to anticipate inundation and flooding.

"We keep ensuring that the micro and macro channels are clean from waste. It aims to prevent overflowing water from the channel and river," he added.

Because of heavy rain yesterday, the rain inundated seven RTs in RW 03, Pegangsaan Dua Urban Village, and RW 10, Sukapura Urban Village.

"The water level reaches 40 centimeters. It has receded now," he added.

One of the residents from RT 03/03, Pegangsaan Dua Urban Village, Yuni (44) admitted inundation in her region was completely receded at around 3 AM.

"I appreciate the UPS Water Agency and PPSU personnel who have worked hard to clean up the waste after the inundation," he uttered.

Hopefully, it could be done immediately by raising the sheet pile of the Cakung Lama River.

"If the sheet pile is higher, it will prevent overflowing waters from Cakung Lama River," he uttered.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1709 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1481 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1335 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1120 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye815 personDessy Suciati